Oskar Blues: Centrifuge – Austin, TX

  • FRF was tasked to install a small centrifuge in the Oskar Blues, Austin, plant.  The team was able to install the piping faster than if it had been manually welded, providing labor savings cost to the Oskar Blues.  Lastly, it was important to test the orbital machine. This last step is a necessary measure to ensure quality of piping welds along with the end-product or high-quality filtered beer.